problems on the roof ... The

22nd October 2010

Verblendarbeiten That walk continued good progress. Only today had to be filed due to the rain a break. But the builders on Saturday but will use the time to catch up. Today we again had

construction conference with the supervisor, our quality inspectors and the roofer. The insulation is now installed correctly, or the window must be still a better seal, just to ensure air tightness.

The shock came when we talked about the installation of gutters. The roofer has determined that the previous company does not have the battens in the roof correctly. Currently there would be such that the last row of roof tiles 15cm ends before the rain gutter :-(

Thus, the entire battens are removed again and corrected ... in addition to the tiles have to back down from the roof.

According to the roofer, the correction in the next week will be carried out so that the installation of the window in the KW44 provided as can be - if the weather cooperates

are available for next week now, following work on.
- finishing the facings (12/11/2010 Status: done)
- Correction of the battens in the roof (status 10.30.2010 : done)
- Insulation of gable crowns (11/12/2010 Status: not done)
- Abbichtung the sole plate in the house (status 30.10.2010: done)
- Start raw installation of electrical (Status 30.10.2010: done)