Tuesday, November 30, 2010

Small Chocolate Oscar Molds In Vancouver

exhibition opens

Our exhibition on the history of Christmas was solemnly opened on Sunday. First visitors and groups have already been passed and here are some pictures.
A special feature of the exhibition has been drafted in Renate Grüttner words: Mary and Joseph find an inn in the house of Maria Stein in a manger, the wood of the oldest Rüthener House, house Buuck , is built. Here you can read an article from the daily press.
Here are some photos:
Fear not! You is born a Saviour!

Elizabeth welcomed Mary


His name is John!

more you see when you visit us!

Saturday, November 27, 2010

Ideos Gratuitos Baitbus

We still have no roof ...

November 2010

Big promises were made us, ... the roof should be closed by the end of the week. But in fact, not much has happened. The wooden structures have been installed on the gables and yesterday are the gutters attached to the eaves or have been - that's all well.













We do not know what you will do it, because up until Thursday of next week the scaffolding be taken down, so on Friday of the gas connection can be established.
is also the house inside while mid become totally wet, after all, we have been waiting since 3 months that the tiles are laid.

This is for today have been only once ... We are really frustrated :-(

Friday, November 19, 2010

Request A Dress Catalog

The next change of site manager ...



November 19, 2010 This morning we presented our 5th project supervisor. We wanted to refuse at first, again to allow a change of site manager. For every change is connected with communication difficulties and may We really no longer use.
But since we have been two other builders already positive feedback about our new site manager, we want to give him a chance to prove themselves.

Unfortunately we had to say today again that happened in the past week has nothing - the roofing work have still not started and the insulation in the exterior walls has not been protected from rain, which are very angry, very.
The only thing that has happened is that the stands have been rebuilt.

We again have set a deadline that by the end of next week the roof work is complete - which has been agreed by the Engineer, too. From the
KW48 should then also be the excavation for building supplies.

Tuesday, November 16, 2010

Healing Minor Frost Bite In Toes

press conference ended

Here are the reports of " Patriot
and
Westfalen Post.

Monday, November 15, 2010

Emerson Garbage Disposal Reset

One need not understand everything ... The

15th November 2010

Today I write something that you do not really need to understand more. Sanny called me today Morning and said, "... sit down and pick a cognac, ... they dismantled the scaffolding!" - And the roof is not even finished.

What was the reason? The scaffolders were mandated by the original fabric workers but apparently not paid - the result is that the scaffolding is removed.

Our site managers thus had this morning a little more organized, because until tomorrow, new frameworks are, the roofers can work with it.

If someone asks us what happened here, let's just say that we wanted our house once a photograph without a frame and therefore the scaffolding for a day were cut :-) The photos have
we put online.













happened to our building seem all that can ever happen to margins.
We hope that the weekend is back to report more productive.

Sunday, November 14, 2010

Van Heusen Suits Review

Plan Voisin (Le Corbusier) - madness or genius?

agreement, the so-called Plan Voisin of the Swiss-French architect Le Corbusier (1887 - 1965) a term. Many know him, but her only by name, so here's the short version:

This is an urban utopia, which was dated to the year 1925. The design shows 18 cross-shaped towers, which are arranged on a grid-like open spaces. He wanted to the quest for air, light and health and to express himself apart from the densely populated inner cities. For this reason, he chose as Place of implementation of the Paris. This fact makes the design of many People seem a bit extreme. The plan was

Voisin, after that there is a law for conservation, never implemented in its most extreme form, and many people hold back for the bare madness, he sure is a big part too.
But he has inspired many architects and urban planners who were some of Le Corbusier's ideas and ideologies into their designs. This, however, favored the emergence of the so-called satellite cities that hinexistieren today many more bad than good to himself. This also includes those cities or neighborhoods that were within a short period of time to meet the increased housing needs of the population (eg: Villes Nouvelles planned cities in France or in Germany).
That fact shows again that a utopia can be implemented not 1:1 because in reality most things do not go as smoothly as on a draft paper.
However, there are also examples of districts in which only became part of Le Corbusier's concept implemented. These housing developments (mostly, these are large housing estates to ) work for themselves quite well, even if they communicate at the city level, not necessarily with their spatial environment.

DS


Sources:
http://www.christiaanse.arch.ethz.ch/upload/RC04.pdf
http://www.wikipedia.org

Figure:

http://archdaily.com

Saturday, November 13, 2010

Snowmobilesalvageyard

Verblendarbeiten are completed ...

13th November 2010

This week it is now managed at last - the Verblendarbeiten have been completed.



















Nearly 5 weeks, the masons who worked on our house. On Wednesday, then Roll the layers in the window sills have been completed.

on Tuesday was also the last, missing windows installed and thus this union is also closed.

Only the roof, there is unfortunately still not the desired progress. While it was developed in the meantime a solution to the gable crowns, was executed for the well by a structural engineer the necessary thermal bridge calculations, but it was time to see another detail: The chosen solution requires a hard foam insulation, the minimum with the required thermal insulation values. 2 weeks delivery time has. In addition, the solution also appeared
constructive not be optimal. Therefore, we have
on Friday with the site manager developed a new solution that can be realized with a soft insulation - and that we already have insulation in the building stock.
Therefore, the new solution was again calculated by our structural engineers and quality inspectors and checked - with the hope that the roofers will begin on Tuesday finally can.

Friday, November 5, 2010

Normal Discharge After Rephresh

The windows are there ...

05th November 2010

There are again two intense weeks behind us. The determined clearest result is that now Sogut as all the windows are installed. The record company has delivered to us very good and fast work - we are totally satisfied.













The Elektrorohinstallation is ongoing. The company has Ramm & Antzcak within two days all the wiring implemented including special needs and we left a good impression.

The Verblendarbeiten could not be completed because we had to endure in the last days of continuous rain, so the builders probably have the next week will be beschäfftigt.

Only the roof, there are still significant problems. The batten was indeed correct, however, our developers so far failed to produce a detailed design of the gable crowns, both the energy and static Requirements. The roofers had to pack up yesterday morning again, because the envisaged construction works.
since 5 August, we urge a suitable solution but so far our builder or structural engineer to be sold nothing useful.
We are really angry, because the weather is better and the developers will finally ensure that the roof is closed.
Moreover, as long as the roof is not covered, the drywall does not start and hang on the turn, the plastering, the sanitary installations, etc. - caused a further delay would be unnecessary.

Hives Viral Infection

FREMO meeting Rosenheim

About All Saints I was at a meeting in FREMO Rosenheim. A great thing when model railroaders together from several different countries who bring their modules and then 3 days pass "on schedule".

My pictures are shown on Picasa:
http://picasaweb.google.com/ettl.paul/FREMO_Rosenheim
and the videos on Youtube: www.youtube.com / user / paulettl
directly or the play list for FREMO Rosenheim 2010:
http://www.youtube.com/view_play_list?p=85285998E1FA6496

One of these videos here:
The journey of the D 109
departure Windach at 10:40 clock - Arrival in Leienfels 11:39 clock
(One hour model time = 10 minutes real time)