Monday, June 28, 2010

French Women With Hair Shaved After 2nd World War

Work began on the first floor ...

28th June 2010

have now started work on the first floor.















Up to the end of the week are the Drempelmauerwerk order in the next week finally, the roof can be built.
... the topping is therefore imminent. However


we have to solve the problem is still with the position of Kaminzuluft and the chimney. To this end we will have a spot at the weekend event, so in the next week, this issue can finally be done.

The latest photos will be put online on Thursday.

Saturday, June 26, 2010

Sweet Warm Up Songs In Basketball

roles for the module racks


Today was a "carpenter work": The first two modules shelves (Ikea shelves) have today received roles. This makes them easy to move and the rearrangement of modules is easier.
So it was cut, drill and screw and announced a slate has found its way into the fingers - ouch!

Wednesday, June 23, 2010

Joby Talbot Free Sheet Music

second first-date of our building experts ...

23rd June 2010

took place today of first-time through our quality auditor and surveyor to check the current construction status.

According to our auditor is the previous version of the shell very well.
All walls have been carried out vertically and to measure and the processing is as it should be. The exception form two columns at the entrance window, here must be a balance in the later part of the cleaning work, because the tolerance dimension has not been observed in the perpendicular of the walls.
The position of the Hall for the chimney and the position for the Kaminzuluft have been found to be incorrect. Here, a solution must be found to be discussed with the contractor and the plumbing company needs.

But overall, gives us the result in advance before a good feeling.

The Drempelmauerwerk has been started but not yet so tomorrow will be started, according to the body shop. The completion of the
Drempels but only in the next Week calculated, and the creation of the roof opposite our building schedule will be delayed by a week, first to 08 Place in July.

Sunday, June 20, 2010

Velveta And Rotel Commercial Recipe

Connected!



The rainy weather has for model railways one great advantage: Man (n) can continue to build on the system. So on this weekend is the "breakthrough" success. The wall system was connected to the windows system!


Fake Proof Of Abortion Papers

The ground floor is ready ...

17th June 2010

elevation on ground floor, the ceiling is already installed and ready for pouring.
is thus the first major milestone: "shell ground floor" was completed.














Now we already got a different impression of the house, since now not only the walls but the ceiling of the Ground fl "feel" are.
It's a nice feeling for the first time by its own "four walls" to go.

However, we have this stupid feeling that the Hall for the chimney above the kitchen is not in the correct position. This will probably have to give a talk on the following Monday with the site manager.

In addition, we have instructed our quality inspectors and surveyors to examine the current construction status to see no fault with the current building.

next week to create the Drempelmauerwerk upstairs - we are excited.

Tuesday, June 15, 2010

Renew Drivers License Temporary Visitor

Trains run again

following the rebuild of the system, the trains again - 4 trains with controlled Rocomotion:

  • An express train (pulled by the BR 24) are close in both directions remains
  • a passenger train (with the BR 80), which are long in both directions remains
  • a railcar, which also is longer in both directions and
  • a freight train, which runs through the station, of course - if possible.

not

The screenshot of the movie control is particularly exciting, but shows the corresponding screen control of the movements of 4 trains.

duration of the whole scene: 7 minutes in real time - model time equals 40 minutes, from 12:00 bis 12:40 clock clock (see model-time Clock above right)!

The change of the track layout at the station was a really important change. There are now - even though track 2 still can not be driven (as a switch does not switch correctly) - much more interesting travel opportunities, protection for the life of the newly added "parking" staging yard.

Two more tips: can be seen on the track image video more if you look at it in full screen mode! And very clever look at the videos on both SAME TIME! So first start the video above and then the track-screen video. The two videos are syncron although not quite, but you can still see the train and the block and street course reservations. can be seen

Sunday, June 13, 2010

Constipation Hard Stools Prenatal Vitamin

background-Poster "river city"


As on previous images and videos , I use behind the long straight stretch the background Poster "river city" by Vollmer. That is no longer apparent. I used this poster also during my plant 1980.

Now I am asked again and again but to which City, there they are. The fact that the poster a collage eand no original photo, it is clear, because it is mirrored in the middle. Nevertheless, there is probably based on a photo of an actually existing city. Those who know this city?
----
PS (14.6.): I sent this question to the company Vollmer and today already received an email with the answer that this is Würzburg. Thank you to the company Vollmer for the quick reply.

Sunday, June 6, 2010

Tiffany Smoking Cigarettes

saving tip for points decoders

Actually, I note the following idea for a long time. But again it's on me that I overlooked: The wiring of switches (whether analog or digital) you can actually save quite nice, if you think about it, which logically points related.

The figure below shows the top left (switch 116 a and b) the obvious version: With a track change, both switches must be set to either straight on or turnoff. It therefore makes sense they want with a switch (or a decoder address).

obviously not quite so - and therefore easily overlooked - is the other variant, as shown in the picture in giving 131 and 104. In these cases, the course always want to against same : Does a straight W 104, 104 may then lead b not straight. 104 is switched on but a branch, must be 104 b on straight. Analog at 131 a and b.



If it can be saved in the digital system has a decoder, the not insignificant financially from!