Saturday, November 13, 2010

Snowmobilesalvageyard

Verblendarbeiten are completed ...

13th November 2010

This week it is now managed at last - the Verblendarbeiten have been completed.



















Nearly 5 weeks, the masons who worked on our house. On Wednesday, then Roll the layers in the window sills have been completed.

on Tuesday was also the last, missing windows installed and thus this union is also closed.

Only the roof, there is unfortunately still not the desired progress. While it was developed in the meantime a solution to the gable crowns, was executed for the well by a structural engineer the necessary thermal bridge calculations, but it was time to see another detail: The chosen solution requires a hard foam insulation, the minimum with the required thermal insulation values. 2 weeks delivery time has. In addition, the solution also appeared
constructive not be optimal. Therefore, we have
on Friday with the site manager developed a new solution that can be realized with a soft insulation - and that we already have insulation in the building stock.
Therefore, the new solution was again calculated by our structural engineers and quality inspectors and checked - with the hope that the roofers will begin on Tuesday finally can.

Friday, November 5, 2010

Normal Discharge After Rephresh

The windows are there ...

05th November 2010

There are again two intense weeks behind us. The determined clearest result is that now Sogut as all the windows are installed. The record company has delivered to us very good and fast work - we are totally satisfied.













The Elektrorohinstallation is ongoing. The company has Ramm & Antzcak within two days all the wiring implemented including special needs and we left a good impression.

The Verblendarbeiten could not be completed because we had to endure in the last days of continuous rain, so the builders probably have the next week will be beschäfftigt.

Only the roof, there are still significant problems. The batten was indeed correct, however, our developers so far failed to produce a detailed design of the gable crowns, both the energy and static Requirements. The roofers had to pack up yesterday morning again, because the envisaged construction works.
since 5 August, we urge a suitable solution but so far our builder or structural engineer to be sold nothing useful.
We are really angry, because the weather is better and the developers will finally ensure that the roof is closed.
Moreover, as long as the roof is not covered, the drywall does not start and hang on the turn, the plastering, the sanitary installations, etc. - caused a further delay would be unnecessary.

Hives Viral Infection

FREMO meeting Rosenheim

About All Saints I was at a meeting in FREMO Rosenheim. A great thing when model railroaders together from several different countries who bring their modules and then 3 days pass "on schedule".

My pictures are shown on Picasa:
http://picasaweb.google.com/ettl.paul/FREMO_Rosenheim
and the videos on Youtube: www.youtube.com / user / paulettl
directly or the play list for FREMO Rosenheim 2010:
http://www.youtube.com/view_play_list?p=85285998E1FA6496

One of these videos here:
The journey of the D 109
departure Windach at 10:40 clock - Arrival in Leienfels 11:39 clock
(One hour model time = 10 minutes real time)

Friday, October 22, 2010

Jcpenney Salon Prices Waxing

problems on the roof ... The

22nd October 2010

Verblendarbeiten That walk continued good progress. Only today had to be filed due to the rain a break. But the builders on Saturday but will use the time to catch up. Today we again had

construction conference with the supervisor, our quality inspectors and the roofer. The insulation is now installed correctly, or the window must be still a better seal, just to ensure air tightness.

The shock came when we talked about the installation of gutters. The roofer has determined that the previous company does not have the battens in the roof correctly. Currently there would be such that the last row of roof tiles 15cm ends before the rain gutter :-(

Thus, the entire battens are removed again and corrected ... in addition to the tiles have to back down from the roof.

According to the roofer, the correction in the next week will be carried out so that the installation of the window in the KW44 provided as can be - if the weather cooperates

are available for next week now, following work on.
- finishing the facings (12/11/2010 Status: done)
- Correction of the battens in the roof (status 10.30.2010 : done)
- Insulation of gable crowns (11/12/2010 Status: not done)
- Abbichtung the sole plate in the house (status 30.10.2010: done)
- Start raw installation of electrical (Status 30.10.2010: done)