Friday, November 5, 2010

Hives Viral Infection

FREMO meeting Rosenheim

About All Saints I was at a meeting in FREMO Rosenheim. A great thing when model railroaders together from several different countries who bring their modules and then 3 days pass "on schedule".

My pictures are shown on Picasa:
http://picasaweb.google.com/ettl.paul/FREMO_Rosenheim
and the videos on Youtube: www.youtube.com / user / paulettl
directly or the play list for FREMO Rosenheim 2010:
http://www.youtube.com/view_play_list?p=85285998E1FA6496

One of these videos here:
The journey of the D 109
departure Windach at 10:40 clock - Arrival in Leienfels 11:39 clock
(One hour model time = 10 minutes real time)

Friday, October 22, 2010

Jcpenney Salon Prices Waxing

problems on the roof ... The

22nd October 2010

Verblendarbeiten That walk continued good progress. Only today had to be filed due to the rain a break. But the builders on Saturday but will use the time to catch up. Today we again had

construction conference with the supervisor, our quality inspectors and the roofer. The insulation is now installed correctly, or the window must be still a better seal, just to ensure air tightness.

The shock came when we talked about the installation of gutters. The roofer has determined that the previous company does not have the battens in the roof correctly. Currently there would be such that the last row of roof tiles 15cm ends before the rain gutter :-(

Thus, the entire battens are removed again and corrected ... in addition to the tiles have to back down from the roof.

According to the roofer, the correction in the next week will be carried out so that the installation of the window in the KW44 provided as can be - if the weather cooperates

are available for next week now, following work on.
- finishing the facings (12/11/2010 Status: done)
- Correction of the battens in the roof (status 10.30.2010 : done)
- Insulation of gable crowns (11/12/2010 Status: not done)
- Abbichtung the sole plate in the house (status 30.10.2010: done)
- Start raw installation of electrical (Status 30.10.2010: done)

Tuesday, October 19, 2010

Can Dogs Use Training Toothpaste

Christmas exhibition in planning



After the very positive experiences of the spring exhibition, we are now planning another exhibition.
In about 12 pictures will tell the Christmas story with original characters Egli.
The Sisters of Mary are looking forward from the stone house to be allowed home to accompany our exhibition and.
A poster has been designed and will be distributed in the coming weeks.
We are looking forward to the new exhibition and hope for many Visitors.

Have Recurring Cystitus What Does A Urologist Do?

Verblendarbeiten going well ... The

19th October 2010

the first time in months we can again say something positive: The Verblendarbeiten progressing well, according to estimates of the Masons, the work completed in the middle of next week.













Last Friday we then met our new construction manager (4). We can only hope that we will retain this site managers and to the end, because each change brings new communications problems.

meantime it had concerns on as many of the wall anchor, despite the new, thinner insulation are still too short. Therefore, it is necessary that the masons chase up additional, longer wall anchor.

The roofers have begun work. Currently, the preparation will be implemented on the roof, so the tiles can be laid.
is our hope that the windows can be installed in the first week of November.

But from a river this year we'll have to adopt intellectual, because only the rich screed drying times of up purely in December.