22nd October 2010

Verblendarbeiten That walk continued good progress. Only today had to be filed due to the rain a break. But the builders on Saturday but will use the time to catch up. Today we again had

construction conference with the supervisor, our quality inspectors and the roofer. The insulation is now installed correctly, or the window must be still a better seal, just to ensure air tightness.

The shock came when we talked about the installation of gutters. The roofer has determined that the previous company does not have the battens in the roof correctly. Currently there would be such that the last row of roof tiles 15cm ends before the rain gutter :-(

Thus, the entire battens are removed again and corrected ... in addition to the tiles have to back down from the roof.

According to the roofer, the correction in the next week will be carried out so that the installation of the window in the KW44 provided as can be - if the weather cooperates

are available for next week now, following work on.
- finishing the facings (12/11/2010 Status: done)
- Correction of the battens in the roof (status 10.30.2010 : done)
- Insulation of gable crowns (11/12/2010 Status: not done)
- Abbichtung the sole plate in the house (status 30.10.2010: done)
- Start raw installation of electrical (Status 30.10.2010: done)

Tuesday, October 19, 2010

Can Dogs Use Training Toothpaste

Christmas exhibition in planning



After the very positive experiences of the spring exhibition, we are now planning another exhibition.
In about 12 pictures will tell the Christmas story with original characters Egli.
The Sisters of Mary are looking forward from the stone house to be allowed home to accompany our exhibition and.
A poster has been designed and will be distributed in the coming weeks.
We are looking forward to the new exhibition and hope for many Visitors.

Have Recurring Cystitus What Does A Urologist Do?

Verblendarbeiten going well ... The

19th October 2010

the first time in months we can again say something positive: The Verblendarbeiten progressing well, according to estimates of the Masons, the work completed in the middle of next week.













Last Friday we then met our new construction manager (4). We can only hope that we will retain this site managers and to the end, because each change brings new communications problems.

meantime it had concerns on as many of the wall anchor, despite the new, thinner insulation are still too short. Therefore, it is necessary that the masons chase up additional, longer wall anchor.

The roofers have begun work. Currently, the preparation will be implemented on the roof, so the tiles can be laid.
is our hope that the windows can be installed in the first week of November.

But from a river this year we'll have to adopt intellectual, because only the rich screed drying times of up purely in December.

Monday, October 11, 2010

Wooden Fingerboards For Sell

subway extensions in Vienna. What? When? Where?

For some time be underground extensions in peripheral parts of town planning. Part of this project was actually implemented already, such as the U1-out extension to Leopoldau (2006) or the expansion of U2 to Aspernstrasse (2010).
Now the extension phase going into the next round.
The U2 is further extended into the seaside town of Aspern, the start of construction to take place already in 2010/2011. This project has already been criticized sharply as some experts think that the expansion to Aspern not really worthwhile. Much more in the development of a functioning tram network should be invested.
The track enlargement of the U1 to Rothneusiedl is now also considered fixed, so that already in 2015 the first trains to run on the new line. Even those upcoming expansion triggers resentment in some people, as is feared that a subway line could disturb the rural idyll in Rothneusiedl. Similarly, the housing estates in the south are favorites too distracted to be tapped properly by a subway line.
an interesting project, the planned construction of the legendary line U5 dar. This should lead from the town hall until after Dornbach and be on top of that associated with the U2. It would open up a densely populated district hereby. However, it is feared by the construction of this line in a loss of purchasing power in some Einkausstraßen, located on the route. However, before the year 2020 not be expected to achieve.
Finally, here is the extension of the U6 are mentioned, which is currently still under discussion. The new line is expected to also lead to Stammersdorf and also connect to the newly planned "top hospital" create Floridsdorf. So far, the Erwiterung that line, however, was rejected because of the development area is populated too thin.

DS


Sources: All graphics and information are from the side http://wiener-untergrund.at collected

Sunday, October 10, 2010

Deng Yi Fen Zhong Lyrics

Verblendarbeiten have begun ... Current

10th October 2010

Since our last entry now much time has passed order to be exactly 1 whole month. We have had many discussions in recent weeks, sought legal assistance and scary must exercise patience.

5 whole weeks there was a halt to the construction site, nothing happened, not even the promised material was delivered. On 23 September there was an escalation conversation between the developer, our construction manager, our lawyer and of course us. We were able to agree on certain events in the next construction, ... and we have been promised a new masonry company that the work is continued.

accident a week later also still be our construction manager very difficult to say what we really, very sorry. But as owners we now had to worry again, not to get ahead. Only after a further week, we received information that the work is definitely at 07 October will start ... and they did.
From this week are back local craftsmen to do the remaining work on Rohmauerwerk and have actually started with the veneer of the base.
Yesterday we were allowed to make a first impression of the work.













On Monday I will discuss the current status of construction management and on Friday will be another event held in order to proceed to plan, especially the detailed solutions for the pediment crown insulation and the side panels of the two gables.
exciting way, the implementation of the desired decorative masonry.






here a picture of the planned
Ornament







is present, the construction management believes that the end of October Verblendarbeiten are completed and the roof work can be carried out.
... since the windows have long to wait, to be installed.